Removal and selective demolition of the existing MRI pad and support facility, and construction of a new addition with shallow foundations, structural steel framing, masonry façade with punched openings and an EPDM roof. Existing exterior window assemblies remained, and safety frame and glazing assemblies were installed in front of the existing windows, with integral blinds between the new and existing windows. The occupied facilities storage space below remained occupied throughout the course of construction on the first floor.
Photo Credit: Clune Construction