This modernization project consisted of two separate build-outs. The first was the collaborative learning center which consists of faculty offices, study areas, class rooms and meeting rooms, and a technology laboratory. All of the areas are supported by new A/V systems.
The second build-out consisted of a fluid hydraulics laboratory which houses individual teaching laboratories and a large open area laboratory. The open area lab includes space for a jet engine, piping rack for hydraulic testing, a 40-foot flume and wier and several storage tanks and pumping systems.