Metal Recycling Plant Site Improvements

CLIENT Confidential
LOCATION Chicago, IL
COMPLETION November 2024
METAL RECYCLING PLANT SITE IMPROVEMENTS

About the project

Construction management services for site improvements to the existing confidential medal recycling yard. Improvements include the excavation and installation of a new 61,000 CF storm detention tank and foundation pad, associated storm piping/catch basins, new structural pads for scrap metal storage, grading improvements to upgrade site drainage and stormwater tie-in to existing Chicago sewer in the right of way. As well as the laying of a 1000-yard concrete pour to accommodate new renovations.

Installation of a 1,300-square-foot pre-fabricated metal shredder emission capture and control system. The project involved the integration of a new emission capture and control system designed to improve air quality and operational efficiency. The pre-fabricated structure was installed to meet environmental compliance standards and support sustainable metal processing operations.

Base Building Chicago, IL

Ready to start a conversation?

Let's discuss how we can collaborate.

Subscribe to our newsletter to keep up with our latest architectural innovations and projects.